Section 1: Power Systems - Installation Checklist¶
Organized by installation order for efficient build workflow. Each item is a check-off confirmation — wire gauges, lengths, torque values, and part numbers live in the linked source docs, not here.
Phase 1: Foundations¶
Battery Compartments¶
- Install Odyssey PC1500 (START) in driver rear wheel well with access panel
- Build enclosed AUX compartment in passenger rear wheel well with access panel
- Install Barnes 4WD battery box in passenger rear wheel well
- Install Dakota Lithium (AUX) in Barnes battery box
Grounding System¶
Ground Bus Bars:
- Mount Engine Bay Ground Bus on firewall (engine bay side) near PMU
- Mount Firewall Stud Bus on firewall (cabin side)
- Mount SwitchPros Ground Bus near SwitchPros controller
Frame Rail Grounds:
- Confirm front frame rail ground point located
- Confirm rear frame rail ground point located
- Confirm START battery- → Engine Bay Ground Bus
- Confirm Engine Bay Ground Bus → engine block
- Confirm Engine Bay Ground Bus → front frame rail
- Confirm AUX battery- → rear frame rail
- Confirm Firewall Stud Bus → chassis ground
- Confirm SwitchPros Ground Bus → chassis/frame rail
- Confirm Engine Bay Ground Bus → AUX battery- (cross-battery reference)
Ground Testing:
- Verify ground voltage drop within spec on all battery-to-frame paths (engine @ 2000 RPM)
- Verify cross-battery ground drop within spec under BCDC charging
- Verify cross-battery ground drop within spec under winch load
Phase 2: Power Distribution¶
START Battery Circuit Breakers¶
- Mount 250A circuit breaker (PMU main power) within reach of START battery
- Mount 80A circuit breaker (BCDC input) within reach of START battery
- Mount 150A circuit breaker (Forward Distribution Bus master) within reach of START battery
- Confirm START battery+ → 250A CB → PMU main power
- Confirm START battery+ → 80A CB → BCDC input
- Confirm START battery+ → 150A CB → 2 AWG forward feed → START+ Forward Distribution Bus
- Confirm PMU ground reference (Pin 25) → Engine Bay Ground Bus
START+ Forward Distribution Bus (engine bay):
- Mount START+ Forward Distribution Bus (Blue Sea 2105, TBD #135) in engine bay with insulated cover
- Mount 60A / 50A / 25A load breakers on a bracket beside the bus
- Confirm Forward Bus → 60A CB → radiator fan power (via relay)
- Confirm Forward Bus → 50A CB → iBooster main
- Confirm Forward Bus → 25A CB → Turbolamik TCU power
- Confirm iBooster enable → Ignition bus Term 5 (7.5A fuse) → firewall Pin 18
- Install Lingenfelter VSFM-002 radiator-fan controller + coolant sensor (sensor P/N TBD #134); verify fail-to-full-speed on lost sensor
Direct Battery Connections (No Circuit Breaker):
- Confirm ECM power/ground connected directly to START battery (per Cummins harness)
- Confirm grid heater relay powered from START battery+ (via integrated fusible link)
- Confirm grid heater ground connected directly to START battery-
Radio Grounds (RF Noise Isolation):
- Confirm GMRS Radio ground → START battery- (direct run for RF isolation)
- Confirm STX Intercom ground → START battery- (direct run for RF isolation)
Testing:
- Verify PMU main power always on
- Verify main power cable voltage drop within spec under load
AUX Battery Inline CBs & Firewall CONSTANT Bus¶
- Mount 300A circuit breaker (forward feed to firewall bus) within reach of AUX battery
- Mount 150A circuit breaker (SafetyHub local feed) within reach of AUX battery
- Confirm AUX battery+ ring lugs landed: Winch, BCDC output, 300A CB, 150A CB
- Confirm AUX battery+ → 300A CB → Firewall CONSTANT Bus
- Confirm AUX battery+ → 150A CB → SafetyHub 150
Firewall CONSTANT Bus:
- Mount Firewall CONSTANT Bus on firewall (cabin side, near BODY PDU)
- Confirm forward feed terminates at bus input stud
- Mount 150A circuit breaker (SwitchPros) at Firewall CONSTANT Bus
- Mount 100A circuit breaker (BODY PDU) at Firewall CONSTANT Bus
- Mount 100A circuit breaker (JL Audio amp) at AUX battery bracket
- Confirm Firewall CONSTANT Bus → 150A CB → SwitchPros power module
- Confirm Firewall CONSTANT Bus → 100A CB → BODY PDU power studs
- Confirm AUX battery+ → 100A CB → JL Audio amp (direct AUX feed, not via firewall bus)
Direct AUX Battery Connections (No Circuit Breaker):
- Confirm AUX battery+ → Winch positive (direct connection per WARN spec)
- Confirm AUX battery- → Winch negative
- Confirm AUX battery- → JL Audio amp ground
BCDC Alpha 50 Installation¶
- Mount BCDC in passenger rear wheel well (water-protected, LED visible)
- Confirm START battery+ → 80A CB → BCDC input
- Confirm BCDC output → AUX battery+
- Confirm BCDC negative → AUX battery-
- Confirm ignition signal → PMU ignition sense tap
Battery Temperature Sensor (REQUIRED for LiFePO4):
- Install BCDC temp sensor on AUX battery positive terminal
- Plug temp sensor into BCDC sensor port
BCDC Configuration & Testing:
- Configure Green Power Priority via RedArc app
- Test jump start assist function
- Verify BCDC LED indicates proper charging mode
Alternator¶
- Install 270A alternator (Premier Power Welder HO-C28)
- Confirm alternator output → START battery+
- Confirm alternator case grounded through engine block mounting
Phase 3: Controllers - Physical Installation & Main Power¶
PMU24¶
- Mount PMU on firewall or inner fender (accessible for LED/USB diagnostics)
- Confirm PMU ground reference (Pin 25) → Engine Bay Ground Bus
SafetyHub 150¶
- Mount SafetyHub 150 in passenger rear wheel well (co-located with AUX battery)
- Confirm AUX battery+ → 150A CB → SafetyHub input
- Confirm SafetyHub ground bus → chassis ground
BODY PDU¶
- Verify all circuit breakers and relays functional in LR-2 unit
- Replace 24V relays (K40, K42, K53) with 12V relays (Resolved in #130. #70)
- Mount LR-2 on firewall (body side, near Firewall CONSTANT Bus)
- Confirm Firewall CONSTANT Bus → 100A CB → BODY PDU power studs
- Confirm BODY PDU ground → Firewall Stud Bus
- Build harnesses to adapt J301-J306 connectors to civilian loads (TBD #69)
- Route heated seat dash switches to LR-2 relay control inputs (K21, K22)
- Label repurposed circuits on LR-2 enclosure
SwitchPros RCR-Force 12¶
- Mount SwitchPros power module on firewall (cabin side, next to BODY PDU)
- Mount SwitchPros Ground Bus at firewall near power module
- Confirm Firewall CONSTANT Bus → 150A CB → SwitchPros power input
- Confirm SwitchPros logic ground → chassis ground at firewall
- Mount SwitchPros control panel on dash; order control cable
- Build custom 2-pin Delphi harnesses for each output (plug-and-play lighting)
Phase 4: Integration & Wiring¶
Firewall Bulkhead Connector¶
- Drill firewall hole for bulkhead connector
- Mount Deutsch HDP24-24-29 receptacle (engine side)
- Assemble Deutsch plug (cabin side)
- Crimp contacts for all 17 wires
- Install sealing plugs in unused cavities
- Verify bulkhead connector seal engagement
- Confirm Pin 1-6 assignments (Engine→Cabin): radio power, PMU lighting outputs
- Confirm Pin 7-17 assignments (Cabin→Engine): CT4 outputs, switch signals, winch control
- Install ferrite chokes on radio power leads (RF mitigation)
Ignition Signal Distribution¶
- Confirm PBS-I PINK IGN (cabin) → ignition signal bus bar
- Confirm ignition signal bus bar → Deutsch connector (outbound to engine bay)
- Install inline fuse on ECM ignition feed (Cummins-mandated ECM Pin 41 protection per 5504137)
- Confirm engine-bay junction → ECM 12V supply + PMU Pin 7
- Confirm bus bar taps split to: CT4, SwitchPros, Fusion Radio, BCDC
- Verify total ignition signal current within spec
PMU Input Wiring¶
- Confirm ignition RUN → PMU Pin 7
- Confirm horn button → PMU In 1
- Confirm brake pedal switch → PMU In 2
- Confirm reverse signal → PMU In 3 (Turbolamik aux output)
- Confirm A/C request → PMU In 9
- Confirm CT4 SW3 (headlight status) → PMU In 7
- PMU In 4, 5, 6, 8 — reserved for future expansion (no wiring)
PMU Output Wiring¶
- Confirm HVAC blower → OUT5
- Confirm GMRS Radio → OUT6
- Confirm oil cooler fan → OUT7
- Confirm PS cooler fan → OUT8
- Confirm Dakota Digital system → OUT9
- Confirm wipers (WS-51C) → OUT11
- Confirm CT4 → OUT13
- Confirm A/C clutch → OUT17
- Confirm horn → OUT18
- Confirm STX Intercom → OUT20
- Confirm brake lights → OUT21
- Confirm reverse lights → OUT22
- Confirm DRL/parking → OUT23
- OUT1–4, 10, 16, 19, 24 — free (no wiring); radiator fan, iBooster, and TCU relocated to the START+ Forward Distribution Bus (see below)
PMU CAN Bus Integration¶
- Confirm J1939 CAN High T-tap → PMU Pin 23/24
- Confirm J1939 CAN Low T-tap → PMU Pin 36/37
- Disable PMU internal CAN termination in software
- Verify CAN bus termination resistance at ECM connector
- Configure PMU to read J1939 SPNs: 100, 110, 175, 190
BODY PDU Circuit Wiring¶
- Confirm Fusion Radio memory → CB30 (CONSTANT)
- Confirm USB ports → CB48 (CONSTANT)
- Confirm WolfBox camera → CB39 (CONSTANT)
- Confirm driver heated seat → CB45 via relay K21
- Confirm passenger heated seat → CB42 via relay K22
- Confirm cargo lights → CB20
- Confirm winch control → CB43
SafetyHub Circuit Wiring¶
- Confirm ARB compressor motor 1 → MIDI-1
- Confirm ARB compressor motor 2 → MIDI-2
Solar Panel Installation¶
- Install Cascadia 4x4 80W panel on hood per manufacturer instructions
- Route solar wiring: hood → firewall → BCDC
- Confirm solar positive → BCDC solar input
- Confirm solar negative → chassis ground (NOT BCDC negative)
- CRITICAL: Verify polarity before connection — reverse polarity damages BCDC
Optional Overvoltage Protection (cold weather):
- Mount overvoltage relay module near BCDC
- Configure overvoltage thresholds and trip delay
- Test threshold settings before final installation
Solar Testing:
- Verify solar charging via BCDC LED in daylight
- Verify solar input voltage within range at operating temperature
Phase 5: Testing & Programming¶
PMU Programming¶
- Program DRL auto-off when headlights active
- Program A/C clutch engagement logic
- Program horn activation
- Program brake light activation
- Program reverse light activation
- Program oil cooler fan from SPN 175
- Program PS cooler fan from SPN 110
- Configure sequential load startup delays
- Export/backup configuration to git repository
PMU Testing¶
- Verify J1939 communication and data accuracy
- Test DRL auto-off logic
- Test A/C clutch engagement
- Test CAN-based fan controls at threshold temps
- Test sequential load startup timing
- Verify LED diagnostics show correct states
- Verify iBooster power always on
System Integration Testing¶
- Verify all PMU outputs operate correctly
- Test all BODY PDU circuits
- Test SafetyHub circuits
- Verify SwitchPros Delphi connectors and outputs
- Verify Deutsch bulkhead connector seal integrity
- Final voltage drop measurements under load (within spec)
- Final ground resistance verification (within spec)
Reference Documentation¶
Power Systems:
- Batteries - START (Odyssey PC1500) and AUX (Dakota Lithium 135Ah) specifications
- BCDC Alpha 50 - DC-DC charger installation and configuration
- Solar Charging - Cascadia 80W panel and overvoltage protection
- START Battery Distribution - Driver rear wheel well connections
- AUX Battery Distribution - Passenger rear wheel well connections
Ground Bus Bars:
- Engine Bay Ground Bus - Blue Sea 2107 PowerBar stud assignments
- Firewall Stud Bus - Blue Sea 2105 MaxiBus terminal assignments
- SwitchPros Ground Bus - Blue Sea 2105 MaxiBus terminal assignments
PMU:
- PMU Overview - Product specifications
- PMU Inputs - Input configuration and CAN bus
- PMU Outputs - Output assignments and ground locations
- PMU Programming - Logic configuration
Distribution:
- BODY PDU - LR-2 circuit breaker and relay assignments
- SafetyHub 150 - ARB and winch fuse assignments
- Firewall Ingress - Deutsch HDP24-24-29 connector pinout
External Manuals: